Difference between revisions of "Development costs"

From YIMBYwiki
Jump to: navigation, search
m (Added U.S. Census Economic Census 2012 table of nationwide data that shows # employees, total payroll, total construction worker hours for contractors that specialize in housing production)
 
Line 23: Line 23:
  
 
== Taxes and fees<br/> <br/> &nbsp; ==
 
== Taxes and fees<br/> <br/> &nbsp; ==
 
  
 
== References ==
 
== References ==
Line 43: Line 42:
 
*Sveikauskas, Leo. “Productivity growth in construction.” ''Journal of Construction Engineering and Management'', Oct 2016. [http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001138 http://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001138].  
 
*Sveikauskas, Leo. “Productivity growth in construction.” ''Journal of Construction Engineering and Management'', Oct 2016. [http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001138 http://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001138].  
  
*U.S. Census. "Construction: Summary Series: General Summary: Specialization in Types of Construction by Subsectors and Industries: 2012." ''2012 Economic Census of the United States.&nbsp;''Release Date&nbsp;: 10/30/2015.&nbsp;[https://factfinder.census.gov/faces/tableservices/jsf/pages/productview.xhtml?pid=ECN_2012_US_23SG06&prodType=table https://factfinder.census.gov/faces/tableservices/jsf/pages/productview.xhtml?pid=ECN_2012_US_23SG06&prodType=table]
+
*U.S. Census. "Construction: Summary Series: General Summary: Specialization in Types of Construction by Subsectors and Industries: 2012." ''2012 Economic Census of the United States.&nbsp;''Release Date&nbsp;: 10/30/2015.&nbsp;[https://factfinder.census.gov/faces/tableservices/jsf/pages/productview.xhtml?pid=ECN_2012_US_23SG06&prodType=table https://factfinder.census.gov/faces/tableservices/jsf/pages/productview.xhtml?pid=ECN_2012_US_23SG06&prodType=table]  
 +
 
 +
Rider Levett Bucknall Ltd. (Phoenix, Arizona, USA). "Rider's Digest 2016." http://assets.rlb.com/production/2016/04/20002334/RLB-Riders-Digest-USA-2016.pdf.
 +
 
 +
"A &nbsp;compendium of USA cost data and related information as well as international cost data.&nbsp;
 +
 
 +
Rider Levett Bucknall is an international property and construction consultancy firm with over 120 offices worldwide.&nbsp;The costs stated in this section represent hard construction costs and reflect the standards and specifications normal to that country or region. Variation in costs may be experienced for factors such as site conditions, climatic conditions, standards of specification, market conditions, etc. Costs for associated site development work such as site formation, utilities, paving, parking and landscaping are excluded.
 +
 
 +
&nbsp; Figures also exclude furniture, fittings and equipment (FF&E) with the exception of figures for Hong Kong, China and Singapore, which do include FF&E in hotel costs.&nbsp;
 +
 
 +
All project soft costs such as land acquisition, design and engineering fees, entitlements, permitting and financing are excluded.&nbsp;
 +
 
 +
&nbsp;
 +
 
 +
[California] Governor’s Budget Summary – 2017-18&nbsp;
 +
 
 +
http://www.ebudget.ca.gov/2017-18/pdf/BudgetSummary/HousingandLocalGovernment.pdf.
 +
 
 +
Total development costs average $332,000 per unit for the construction of new affordable units&nbsp;
 +
 
 +
&nbsp;
 +
 
 +
&nbsp;
 +
 
 +
&nbsp;
 +
 
 +
&nbsp;

Latest revision as of 17:44, 8 September 2017

Development costs are all those required to complete a new project such as housing

 

Land acquisition cost

 

Entitlement cost

 

Design 

 

Financing

 

Construction costs
 

Taxes and fees

 

References


 

Rider Levett Bucknall Ltd. (Phoenix, Arizona, USA). "Rider's Digest 2016." http://assets.rlb.com/production/2016/04/20002334/RLB-Riders-Digest-USA-2016.pdf.

"A  compendium of USA cost data and related information as well as international cost data. 

Rider Levett Bucknall is an international property and construction consultancy firm with over 120 offices worldwide. The costs stated in this section represent hard construction costs and reflect the standards and specifications normal to that country or region. Variation in costs may be experienced for factors such as site conditions, climatic conditions, standards of specification, market conditions, etc. Costs for associated site development work such as site formation, utilities, paving, parking and landscaping are excluded.

  Figures also exclude furniture, fittings and equipment (FF&E) with the exception of figures for Hong Kong, China and Singapore, which do include FF&E in hotel costs. 

All project soft costs such as land acquisition, design and engineering fees, entitlements, permitting and financing are excluded. 

 

[California] Governor’s Budget Summary – 2017-18 

http://www.ebudget.ca.gov/2017-18/pdf/BudgetSummary/HousingandLocalGovernment.pdf.

Total development costs average $332,000 per unit for the construction of new affordable units